Important Message -
  • * MCGM has issued the NOC for transportation of debris (SWM NOC) for the building construction project undertaken by you/ your client. It is observed that the details of actual transported quantity is not uploaded / updated through architect / Developers console . You are therefor requested to upload /update actual transported quantity along with challan immediately.Falling which no further approvals will processed in the respective files.
  • * Digitally signed PRC is available during submission. Authentic maps are available at https://mahabhunakasha.mahabhumi.gov.in/bhunaksha/27/index.jsp
  • * In case if excavated material is used on same site then no royalty permit from collector is required
  • * As per the directions dtd. 28.09.2018 from कक्ष अधिकारी, उद्योग, उर्जा व कामगार विभाग, महाराष्‍ट्र शासन, all Developers are hereby directed to register the construction workers working on various sites directly or through contractors with Deputy Labour Commissioner (Mumbai City / Mumbai Eastern Suburbs / Mumbai Western Suburbs) immediately. Click here to download.
  • * All developers/architects of ongoing projects are instructed to adopt proper precautionary measures on sites, particularly during monsoon period, so as to avoid any untoward incident.
  • * Dear Users, it is recommended to have 16 mbps of internet bandwidth on your local laptop/ PC for optimized application access.

System Updates

  • Enhancement in document preview of document checklist, notesheet's attachment, additional document.
  • Site Photographs /Videos for all type of application in Commencement other are mandatory now.
  • Now all Intimation of All BP approvals application(i.e. IOD, Plinth CC,FCC ,Part/Full OC) are sent to Assessment & collector department on their email ids.
  • Applicant can add Additional Documents in Draft file of Revenue-Excavation Permission.
  • Multiple conditions can be removed on single click(i.e. in IOD, Amended & LOA processes ).
  • General bug fixes and optimizations.
  • Project details can be seen at officer console in one click.
  • All challans against the project should be paid to approve any application in the same project.
  • All challans against an application can be checked at officer console in a single click.
  • Other documents related enhancements.
  • Forgot username for developers provided.
  • Complience conditions can be added after application creation.
  • CSV report generation from accounts console.
  • Date filter in CSV report provided.
  • Option to apply for Pre-Monsoon applications in Lockdown period provided in architect console
  • Revised flow of Miscellaneous Applications till MC.
  • Other option in remarks removed from CCRF apply NOC form.
  • IOD drawing is now available at citizen search.
  • General bug fixes and optimizations.
  • Joint Inspection - few enahancements and bug fixes.
  • In Revenue dept - changes in form of excavation permission.
  • Change of Architect - few bug fixes.
  • Additional conditions- drag drop facility and user can comply at any ongoing stage.
  • Application performance optimizations.
  • Provision to apply Zero FSI appication in Applicant’s Console.
  • Authorization of certificate is now mandatory through preview windowbefore sign.
  • System now will allow to Amend or revalidate previous project's applications.
  • Pop up alerts in architect's console for pending 3rd Party inspections and Site Progresses.
  • Site Progress of various applications now available on citizen search.
  • Improvements in Application's flow UI.
  • Improvements in Common Completion Request Form UI.
  • Other bug fixes and optimizations.
  • Facility to add Existing Projects (Old Cases) and Applications provided in Applicant’s Console.
  • Now applicant must provide Site Progress's photos and videos in every 3 months.
  • Joint Inspection's dashboard updated.
  • Bifurcation of charges based on user selection provided in Air conditioning and Mechanical Ventilation application.
  • Now system will calculate and create challan in case of Amended Provisional Fire Applications.
  • Note Sheets of NOC department’s officers are now available on citizen search.
  • Improvements in Citizen Search's attachments UI.
  • Other bug fixes and optimizations.
  • Applicant now can directly apply for Occupancy if there are no conditions pending to comply with further CC in 342 cases.
  • Reason and attachment are required now if user selects NA for any application at CCRF stage.
  • Scrutiny for the files with 337 case type is now mandatory.
  • New GL codes for HE and ME department has been incorporated.
  • Officers can view previous challans against applications in View Project Summary tab.
  • Suggested improvements of SWM Revalidation.
  • Other bug fixes and optimizations.
  • Revalidation for SWM Applications can be processed through the system.
  • System generated Occupancy Certificate for 342 case is now available.
  • Officers now can delete unsigned note sheets.
  • Multiple login from same browser will be blocked now onwards.
  • Note sheet signed date is displaying instead of created date.
  • Survey resubmission issue has been resolved.
  • General bug fixes and optimizations.
  • System Optimizations.
  • NMA related bug fixes.
  • LOA application can be applied in case of 342 Commencement.
  • Now applicant or officer can add amended conditions.
  • Applicant or officer can add applications further to the applications approved in the previous project.
  • Compliance screen In case of FirstCC applications has been optimized.
  • Approved FirstCC and FurtherCC applications are now accessible through AAI console.
  • 3rd Party Joint Inspection for SP and SWD at the time of CCRF.
  • Option to create multiple note-sheets for other (NOCs) departments.
  • Advanced search filters for joint inspection summary.
  • Type of Notice will no longer required for Electricity application
  • Applicant can create an Amend Fire Application directly (If the fire noc had already been taken offline).
  • Now AAI NOC for Height Clearance can be applied through CCRF.
  • Feedback System for approved applications.
  • Integration of Signed PR card against CS/CTS number.
  • Applicant can update CTS/CS/FP number in amend application.
  • In SWM applications officer can edit total estimated quantity of project.
  • Total used quantity and Total estimated quantity of the project will be available on certificate now onwards.
  • Update of Contact Us details.
  • Updates in Fee Calculator.
  • Project Based System Deployed.
  • Updated central railway documents list.
  • Separate declaration letters for architect and developer.
  • MIS for fire department.
  • Updated document list for different fire applications.
  • Permission for ring well.
  • Provisional Permission For Existing Surface Well.
  • Completion Permission For Existing Surface Well.
  • Initial Application Mechanical Ventilation and Air Conditioning.
  • Completion Application Mechanical Ventilation and Air Conditioning.
  • Initial Application M and E Systems in Amenities.
  • Completion Application M and E Systems in Amenities.
  • Initial Application Mechanised Parking System.
  • Completion Application Mechanised Parking System.
  • Corpus Fund Remarks.
  • MHADA Repair Building Application Introduced
  • JSI Dashboard Improved
  • SWM MIS Released to public
  • Common Application Form (CAF) digital signature by developer is introduced.
  • 4A & 4B documents digital signature by Architect is introduced.
  • Old Cases - Architect can upload approved documents for old case applications.
  • System Approved Tab is introduced.
  • Displaying date & time on documents.
  • PCO - Borewell / fountain permission is online.
  • PCO - MIS reports introduced.
  • SWM - Developer console to update transportation details.
  • Special Cell - Proposal allotment randomization is removed for special cell.
  • Electricity NOC - Export to excel feature is introduced.
  • SWM - Debris On Call Service
  • Miscellaneous proposals for 337 type of notice
  • JSI - Joint Site Inspection Dashboard
  • Railway NOC - Central & Western Railway
  • JSI - Joint Site Inspection Dashboard
  • System generated remarks for SWD, SP, HE & Traffic – Street light
  • Randomizations at Sub Engineer level for 337/ 302 fresh cases
  • Joint Inspections
  • Move to Draft option in Due Payment for architect
  • Change in File Number option for Old Case file
  • Change in Annexure Details (Applicant Name & Address) option in Officer's Console
  • New Signing functionality for Certificates & Notesheets
  • Change in scrutiny work flow
  • Change of architect functionality provided to SE
  • Least area from land details will consider for scrutiny
  • Allow multiple payment mode for a single transaction

Important Notifications

VIDEO GALLERY