Fee & Deposits
Premiums
Penalties
*
Building Use :
Select Use
Residential
Commercial(Merchantile)
Industrial
Educational
Assembly
Institutional
Govt/semi-public/pvt.Business)
Utility/services
Storage/Warehouse
*
Built up Area (Sq.m)
*
Plot Area (Sq.m)
*
Zonal FSI
*
RR Rate (land) (INR)
Link to view latest Ready Reckoner (RR) rate
*
Basic FSI
*
Zones
Select
City
Suburb
*
Proposal
Select
33(7)
33(9)
Other
*
Institute Type :
Select
Primary Education
Secondary Education
Medical Institutes
*
Notice Type :
Select
337
342
Proposed TDR Utilization (Sq.m)
Construction Rate SDRR(INR)
Include Layout Scrutiny Fee
*
Details of Amount to Pay
Heads
Formulae/ Calculation Logic
Unit for Calculation
Rate
Amount to Pay (INR)
Help
Scrutiny
(Built Up Area * Rate)
Sq.m
IOD Deposit
(Built Up Area * Rate)
Sq.ft
1
Debris removal deposit
(Maximum Rs. 45000)
(Built Up Area * Rate)
Sq.ft
2
Development Cess
{Proposed Built up area - (Plot area * Zonal FSI)} * 30% of RR Rate
Sq.m
Labour Welfare Cess
(Proposed Built up area * 1% of Construction Rate)
Sq.m
Development Charges
Total(Land Component + Built Up Component):
Land Component
(Proposed Built up area * 1% of RR Rate)
Sq.m
Built Up Component
(Proposed Built up area * 1% of RR Rate)
Sq.m
Layout Scrutiny Fee
Sq.m
5.2
TDR Utilization Scrutiny Fee
Sq.m
48
Infrastructure Improvement Charges for TDR
Sq.m
*
Building Use :
Select Use
Residential
Commercial(Merchantile)
Industrial
Educational
Assembly
Institutional
Govt/semi-public/pvt.Business)
Utility/services
Storage/Warehouse
*
RR Rate (INR)
*
Basic FSI
*
Consumed FSI
*
Rehabilitation ratio
*
Telescopic factor
*
Details of Amount to Pay
Heads
Formulae/ Calculation Logic
Unit for Calculation
Rate
Amount to Pay (INR)
Help
Fungible FSI (Proposed Fungible Built up area* Ready Reckoner Rate)
Built up area (Sq.m)
(Built Up Area *
% of RR Rate)
Sq.m
Premium for Staircase, Lift, Lift Lobby area
Proposed Builtup area of staircase, lift, lift lobby claimed Free of FSI (Sq.m)
Sq.m
Open space deficiency in case of proposal u/s 33(7)
Deficient open space area (Sq.m)
Sq.m
AVS Deficiency
Deficient area at all habitable floors
Sq.m
Premium for Internal Staircase
Area of the internal staircase (Sq.m)
Sq.m
Balcony enclosure
Area of the Balcony (Sq.m)
per number
Deficiency in car parking: u/s 33 (7)
Deficient area of parking (Sq.m)
Sq.m
Additional Premium FSI
Built up area (Sq.m)
Sq.m
PAVED R.G Premium
Plot Area (Sq.m)
Sq.m
50 Rs
Carriage Entrance
Number of Entrance
Number
800 Rs
Deficient Access/ drive way
Built up area (Sq.m)
Sq.m
Deficient width of staircase
Deficient area at all habitable floors(Sq.m)
Sq.m
Layout infrastructure deposit
Gross plot area (Sq.m)
Sq.m
50 Rs
Parking projection in FOS
Projecting area (Sq.m)
Sq.m
Cantilever Building line projecting within 3.0 mtr from compound wall
Projecting area at all habitable floors (Sq.m)
Sq.m
Infrstructure chrges under reg 33(3) (A)
Built up area claimed under regulation (Sq.m)
Sq.m
Lucaravtive Premium
Eating House, Nursing home Ice Factory, Printing press Departmental stote at entire Ground floor in R-1
Built up area(Sq.m)
Sq.m
Hotel and lodging house in R-2
Built up area(Sq.m)
Sq.m
Cinema Theater
Number Of Seat
Seat
Petol pump , service station and repairring Garrage
Built up area(Sq.ft)
Sq.ft
Floor Mill
Nos
Each
Storage of bottled gas
Built up area(Sq.ft)
Sq.ft
*
RR Rate (INR)
*
Construction Area (Sq.m)
*
Premium Rate (INR)
*
Basic FSI
*
Penalty Types
Select
Work carried out beyond CC but within approved plan
Work carried out beyond CC within approved plan but after issue of Stop work notice
Work carried out without approval within plot potential (including set back area)
Work carried out without approval but regularisable by way way of utilising TDR or amalgamation of additional plots or additional FSI as per DCR 33
For change of user / Activity within approved / Authentic Building
For alterations / Interior works i.e. erection of cabins / partitions within approved / authentic building or work of foundation of any type or escalation work
Type of building
Select
Composite Building
Non-Composite Building
Only For Rehab Building
Non-Composite Building
Sale Building
*
Proposal Type
Select
33(5)
33(7)
33(9)
Other
Building Use
Select
Residential
Commercial
Industrial
*
Built Up Area Under Alterations (Sq.m)
*
Plot Area (Sq.m)
*
Details of Penalty
Heads
Formulae/ Calculation Logic
Unit for Calculation
Rate
Amount to Pay (INR)
Help
Sq.m